Our crews. Your sequence. On time.
Every FabChoice installation is done by our own in-house crews. We schedule to your site plan, coordinate with cabinet and plumbing trades, and install the same way on a hospital wing or an apartment tower.
How an install runs
01
Sequence planning
We build the install schedule from your site schedule, by building, floor and room.
02
Site-ready check
Cabinets and supports are fully installed, ready to be accurately templated to the exact size to be cut.
03
Delivery
Tops arrive labeled by unit and floor, to be installed while maintaining efficiency and quality.
04
Set, seam & seal
Tops can be set and seamed, with sinks mounted, and completely installed in one visit.
05
Clean-up & punch
Work areas are left clean, with a walkthrough and punch list at closeout.
Our Installation Process
Installed for the way each building runs
Floor-by-floor installs for senior living, apartments and condos, with crews added when your schedule accelerates.
Our crews. Your sequence. On time.
Every FabChoice installation is done by our own in-house crews. We schedule to your site plan, coordinate with cabinet and plumbing trades, and install the same way on a hospital wing or an apartment tower.
How an install runs
01
Sequence planning
We build the install schedule from your site schedule, by building, floor and room.
02
Site-ready check
Cabinets and supports are fully installed, ready to be accurately templated to the exact size to be cut.
03
Delivery
Tops arrive labeled by unit and floor, to be installed while maintaining efficiency and quality.
04
Set, seam & seal
Tops can be set and seamed, with sinks mounted, and completely installed in one visit.
05
Clean-up & punch
Work areas are left clean, with a walkthrough and punch list at closeout.
Our Installation Process
Installed for the way each building runs
Floor-by-floor installs for senior living, apartments and condos, with crews added when your schedule accelerates.