Our crews. Your sequence. On time.

Every FabChoice installation is done by our own in-house crews. We schedule to your site plan, coordinate with cabinet and plumbing trades, and install the same way on a hospital wing or an apartment tower.

Install crew setting a countertop, two installers with the top mid-placement

Process

How an install runs

01

Sequence planning

We build the install schedule from your site schedule, by building, floor and room.

02

Site-ready check

Cabinets and supports are fully installed, ready to be accurately templated to the exact size to be cut.

03

Delivery

Tops arrive labeled by unit and floor, to be installed while maintaining efficiency and quality.

04

Set, seam & seal

Tops can be set and seamed, with sinks mounted, and completely installed in one visit.

05

Clean-up & punch

Work areas are left clean, with a walkthrough and punch list at closeout.


Video

Our Installation Process


Multi-family

Installed for the way each building runs

Floor-by-floor installs for senior living, apartments and condos, with crews added when your schedule accelerates.

Multi-family install: crew working in a unit kitchen with cabinets set
Multi-family install: finished unit kitchen
Multi-family install: bathroom vanity tops
Multi-family install: crew carrying a top into the building
Multi-family install: amenity or clubhouse kitchen